Connect suppliers and buyers on a route
Think of the route canvas as a sentence: this supplier sends to this route, which can deliver to this buyer. Here’s how to save that sentence.
Step by step
Open the route’s Flow tab
Sign in as a workspace administrator. Open Routes, choose the route and switch to Flow. Have the supplier and buyer records ready before editing.
Connect both sides
Choose Connect a supplier, select the supplier and choose Add connection. Repeat with Connect a buyer. The canvas should show the supplier feeding the route and the route feeding the buyer.
Review the buyer’s connection
Select the buyer connection to review its active state, priority, weight and filters. When you’ve finished, choose Done. The changes stay in the route draft until you save.
Save and reopen
Choose Save route. Reopen the route and inspect both connections. To remove one later, select it, choose Disconnect and save. Future leads will use the updated connections.
What if somebody else saved first?
Reload the latest route, check what your teammate changed, then reapply your edit to that version and save.